Max Gear MAX 7142 Instrukcje Operacyjne Strona 11

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 24
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 10
Documented ProcedureBPA
D o c u m e n t e d P r o c e d u r e
MPZ 001
4100-001-06.05
Department TB / Schell
Assembly Plan
Toothed Racks
Servo Line
Page 11 24
Rev. Index D Name 01.06.05 Schell
Date 3.05.2011 released 01.06.05 Lorch
MPZ_001_engl.doc
Mounting example on the machine bed
3. Remove the mating companion piece and the auxiliary contact surface.
5. Put the measuring bridge on a smooth-ground surface and set the dial gauge to
zero.
4. Exact alignment of the racks at the joint
is obtained with the aid of a mounting set
consisting of a displacement device, three
magnetic measuring rolls and a measuring
bridge with dial gauge as well as a hexagon
wrench.
Suitable sizes and a description can be
taken from our servo catalogue or our
web-site: http://www.atlantagmbh.de.
zero setting
Przeglądanie stron 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 23 24

Komentarze do niniejszej Instrukcji

Brak uwag